
Rotor Packing (Optimisation) Set
Rotor packing may be needed for any of the following reasons:
- To trim runaway voltages lower (MPPT and GTI applications)
- To manually optimise PMA directly connected to battery banks (PWM applications)
- To reduce hysteresis losses in some lower power MPPT and GTI applications where you need less power than the PMA can produce at the desired RPM
A larger 1st position packing washer (marked red)Ā is provided so that the 1st washer (if needed) sits flat and does not rock on the end of the protruding thread.Ā
ForĀ MPPT and GTI applicationsĀ it is critically important to check that the maximum runaway voltage of the turbine is at least 5% lower that the maximum input voltage of the MPPT/GTI. If not pack out the rotor until it is or contact your supplier.
Once you have the turbine operating (PWM regulation) you can experiment with packing washers, add them one at a time and if you generate more power then keeping doing it until you no longer increase power.Ā
Lower power MPPT/GTIĀ sites may also benefit from reducedĀ hysteresis losses so try some packers to see if you can get more power.Ā
Refer toĀ PowerSpout Document Index LinksĀ for a complete index of documents.
Original: $459.77
-70%$459.77
$137.93Product Information
Product Information
Shipping & Returns
Shipping & Returns
Description
Rotor packing may be needed for any of the following reasons:
- To trim runaway voltages lower (MPPT and GTI applications)
- To manually optimise PMA directly connected to battery banks (PWM applications)
- To reduce hysteresis losses in some lower power MPPT and GTI applications where you need less power than the PMA can produce at the desired RPM
A larger 1st position packing washer (marked red)Ā is provided so that the 1st washer (if needed) sits flat and does not rock on the end of the protruding thread.Ā
ForĀ MPPT and GTI applicationsĀ it is critically important to check that the maximum runaway voltage of the turbine is at least 5% lower that the maximum input voltage of the MPPT/GTI. If not pack out the rotor until it is or contact your supplier.
Once you have the turbine operating (PWM regulation) you can experiment with packing washers, add them one at a time and if you generate more power then keeping doing it until you no longer increase power.Ā
Lower power MPPT/GTIĀ sites may also benefit from reducedĀ hysteresis losses so try some packers to see if you can get more power.Ā
Refer toĀ PowerSpout Document Index LinksĀ for a complete index of documents.














